It might float at this point

The Basement walls are sealed and the dimple mat is in place.  The drain tile was also installed and for the rock delivery we witnessed a unique truck that is remote controlled and with a conveyor belt arm that can propel rocks into place as far as 100 feet away.

Just in time to beat the rain, the back-fill is also completed and that is captured in this week's time-lapse video.

Next up is removal of the extra back-fill; Monday is a big day as the first floor will take shape with framing beginning.