Amazing work
As the sun set today the RJ Stegora crew rushed to complete the massive job of digging out the remainder of the basement. A 10 foot deep hole is now ready for footings and the Lego like task of assembling the insulated concrete BuildBlock foam. There was also a huge task during the morning hours of removing the fence between our back yard and the new house to make room for additional amount of dirt that will later be used to back-fill the basement hole. We can safely say there is no longer room to store anything in addition to what we have now (check out the gallery for some of that work). With melting snow temperatures the coming next week some effort will be directed towards the diversion of water from our neighbors downspouts away from the work space.