Basement work complete
With a few days in the rain, we finally got a break to tap into the water and city sewer. With that done we were able to finish the insulation of the basement flooring, first laying 2 inches of sand followed by 6 inches of firm foam insulation.
With all plumbing done in addition to the foam, the vapor barrier now set and taped sealing the basement. Tomorrow the city inspection is done early in the morning and we then pour 4 inch basement slab. While the cement truck is there we also have footings framed in place for the porch so that will also take shape.